Entsorgungsbetrieb der Stadt Siegen
Goldammerweg 30
57080 Siegen
Dipl.-Ing. Uwe Siemann – project leader
Telephone: +49 (0)271 31 45-606
E-mail: uwe.siemann@esi-siegen.de
Prof. Dr.-Ing. habil. Wolfgang Krumm - project leader
Telephone: +49 (0)271 740 2634
E-mail: W.Krumm@et.mb.uni-siegen.de
Moritz Gebser - direct contact person
Telephone: +49 (0)271 740 4624
E-mail: moritz.gebser@uni-siegen.de
Dr. agr. Uwe Pihl - direct project contact
Telephone: +49 (0)2065 9945 69
E-mail: u.pihl@fehs.de
Heiner Guschall - project contact
Telephone: +49 (0)2733 811760
E-mail: h.guschall@sicon.de
Planned results:
The project focuses on energy-self-sufficient recovery of phosphates from sewage sludge. By means of the amendment of the Abfall-Klärschlammverordnung obliges sewage plant operators to recover phosphorus from wastewater. Dried sewage sludge is gasified to generate gas and coke. Coke originated from the gasification is burned in a bubbling fluidized bed reactor to enrich the resulting ashes with phosphorous. Afterwards the phosphorus is recovered by melting the ashes. Heat generated by the bubbling fluidized bed reactor is used for different steps of the process. The process should be realized by combining a new type of thermal process for sewage sludge treatment with melting the ashes.
The aim of this project is to develop a process for energy-self-sufficient phosphorous recovery. The product of this process is a phosphorous recycled material for agricultural use. The knowledge and data gained in this project should be used for an up-scaling of the plant which is used for thermal treatment of sewage sludge.
Entsorgungsbetrieb der Stadt Siegen
Universität Siegen
FEhS
Entsorgungsbetrieb der Stadt Siegen
Universität Siegen
FEhS